1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
dlinn [17]
3 years ago
13

Can someone quickly tell me where to graph the numbers 1-4

Mathematics
1 answer:
miskamm [114]3 years ago
6 0
 i know the answer to 1 is 10
You might be interested in
The width of a rectangle is 5 more than twice the length. the perimeter of the rectangle is 28 in. what is the length and width
ycow [4]

Perimeter is P = 2l + 2w. From the question you know that w = 2l + 5 and that P = 28. To find l, plug the expression for w into the perimeter equation:

28 = 2l + 2(2l + 5) 

28 = 2l + 4l + 10

28 = 6l + 10

18 = 6l

3 = l

Now find w by plugging 3 into its equation - w = 2(3) + 5. w = 11

Lastly, check your work by plugging everything back into the perimeter equation:  28 = 2(3) + 2(11), which is 28 = 6 + 22. Correct! So the length is 3 in and the width is 11 in.

5 0
3 years ago
Solve.<br><br> 100x − 200 &gt; 60x − 120
irakobra [83]

Answer:

x>2

Step-by-step explanation:

Step 1: Subtract 60x from both sides.

100x−200−60x>60x−120−60x

40x−200>−120

Step 2: Add 200 to both sides.

40x−200+200>−120+200

40x>80

Step 3: Divide both sides by 40.

40x/40> 80/40

x>2

Hope this helped :)

8 0
3 years ago
What’s the sum of a number x and three is equal to eleven
anygoal [31]

Answer:

x = 8

Step-by-step explanation:

your equation can be written as: x + 3 = 11

subtract 3 from both sides to isolate x: x = 8

your answer is 8

8 0
3 years ago
35-12+6×36÷4 simplify it​
fomenos

Answer:

35-12+6×36÷4

the answer is 77

6 0
3 years ago
seven people need 90 days to repair and paint a heritage building.if the job should be completed in 15 days.how many more people
IRISSAK [1]

Answer:

Here is your answer mate

Step-by-step explanation:

As we know that 7 person take 90 days so 1 person takes 90×7=630 days

As work has to be finished in 15 days than 630/15=42 so

42 people can complete work in 15 days but as we have already 7 people employed so required are

42-7=35 so 35 more are needed

6 0
4 years ago
Other questions:
  • Dan earns $42.75 per month working as a tutor. He worked as a tutor for 4 months. He also earned $52.45 walking dogs in the neig
    9·1 answer
  • Analyze the diagram below and complete the instructions that follow.
    15·1 answer
  • here were 84 runners to start a race. in the first half of the race, 13 of them dropped out. in the second half of the race, 14
    5·1 answer
  • What is 4x-2y=8 and y=2x+1 using substitution
    10·1 answer
  • Decimals from 7 to 8 with an interval of 0.2 between each
    15·1 answer
  • An item is regularly priced at $90. Is is on Sale for 20% off the regular price. How much (in dollars) is discounted from the re
    12·2 answers
  • X-5y = 0, y +1=3(x+5)<br> Determine whether the lines are parallel, intersect, or coincide
    7·1 answer
  • please help im having such a hard time :( does this equation have no solution one solution or infinite solutions
    15·2 answers
  • Im so confused help fast!!
    7·1 answer
  • How can I write 2 feet 6 inches into centimeters? <br><br> Explain please
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!