1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Amiraneli [1.4K]
3 years ago
9

Select the inequality that is desplayed by the following graph.

Mathematics
1 answer:
Naddik [55]3 years ago
6 0

Answer:

yes

Step-by-step explanation:

You might be interested in
The average of 10 numbers is -5. A new number is added to the list making the average -6. What is the new number?
Shtirlitz [24]

Answer:

- 16

Step-by-step explanation:

Average is calculated as

average = \frac{total}{count}

Thus for the given 10 numbers we have

\frac{total}{10} = - 5 ( multiply both sides by 10 )

total = - 50

let the number added be x, then

\frac{total+x}{11} = - 6 ( multiply both sides by 11 )

total + x = - 66, that is

- 50 + x = - 66 ( add 50 to both sides )

x = - 16

The new number is - 16

4 0
3 years ago
A carpenter has 10 1/2 feet of wooden plank. He cuts off 4 1/4 feet to replace the slat of a deck and 3 2/3 to repair a Banniste
aalyn [17]
10 1/2-4 1/4= 6 1/4. 6 1/4-3 2/3= 2 7/12. They used 2 7/12 ft or 2ft 7in of wood to fix the stairs.
8 0
3 years ago
Read 2 more answers
20) Fred bought 3 shirts, each of the same price and received less than $12 change from a $50 bill.
gladu [14]
<h3>Three t-shirts can be represented as "X" and 3 will be represented as the number of t-shirts Fred bought.</h3><h3 /><h2>3x = 50</h2><h3>÷3       ÷3    ← divide both sides by 3</h3><h3 /><h3>X = $16.66 maximum cost.</h3>
4 0
3 years ago
Read 2 more answers
A furniture manufacturing company manufactures dining-room tables and chairs. A table requires 8 labor-hour s for assembling and
aev [14]

Answer:

See Annex   In blue feasible region ( using Geogebra)

Step-by-step explanation:

Table 1.-

                                         Assembling hours           finishing hours

Product (tables)  x                         8                                    2

Product ( chairs)  y                         2                                    1

Availability                                  400                                  120

Constrains:

1.-Availability of assembling hours  400

8*x   +  2* y    ≤  400

2.-Availability of Finishing hours

2*x  + 1*y  ≤  120

3.-General constraints

x ≥ 0    y  ≥  0   integers

6 0
3 years ago
HELP HELP HELP ASAP please
polet [3.4K]

Answer:

i think it might be number 1

Step-by-step explanation:

3 0
3 years ago
Read 2 more answers
Other questions:
  • Please could someone help me with these questions sorry about the scribbling on one page I got stuck
    5·1 answer
  • A waiter earns $11.00 an hour and approximately 10% of what he serves in a shift. If he works a 6 hour shift and takes $425 in o
    12·1 answer
  • 8 to the second power +9 (12 divided by 3 x 2) – 7. explain
    10·1 answer
  • what is the volume of a right rectangular prism with a base that measures 4 inches by 6 inches and a height of 7 inches​
    6·1 answer
  • Are the following rational or irrational?
    6·1 answer
  • Find the equation, (f(x) = a(x-h)2+ k), for a parabola containing point (-1,0) and having (-3, 4) as a vertex. What is the stand
    11·1 answer
  • Henry bought 246 pieces of candy to share evenly with his 6 guests. How many pieces of candy will each guest recieve?
    6·2 answers
  • Find m of ZX<br> in circle P.<br><br> 70<br> 95<br> 155<br> 205
    9·1 answer
  • Which two traits are aquired during a person's lifetime?
    7·2 answers
  • Question Subtract. 3 1/3−5 Enter your answer as a simplified mixed number by filling in the boxes.
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!