Answer:
Design, Design, Click and Drag, Subform Wizard
Explanation:
Enginuity 2022
Three essential <span>principles of test construction are:
1. consistency. It refers to the consistency </span><span>between the goal of the subject, course, and the methods of teaching goals. Also consistency between the methods and what the test measures. </span><span>
2. validity. Validity refers to t</span>he ability of a test to measure what it was designed to measure. It can be material od skill.
3. reliability. The <span>test must be constructed in such a way that it will produce reliable, consistent results .</span>
Poor planning or poor project management is the number one reason why projects fall behind schedule or fail. We all know how important it is to plan before acting, even more in the area of management of the different areas of the project, it is important to define the objectives of the project from day one, defining them will mean success or failure of the project and from this point to advance in the planning of all areas before starting to do any work.
To meet the target the projected output level for next year required is 712,750.
What is sales budget ?
A sales budget is a financial strategy that projects the entire income of a business over a given time frame. To forecast the performance of the company, it relies on two factors: the volume of products sold and the price at which they are sold.
The calculation of the production level required to accomplish the goals for the following year is presented below:
Ending Inventory (662,000 ÷ 12 × 1.5) 82,750
Sales Budget 662,000
Total inventory required 744,750
Less Beginning Inventory -32,000
Production 712,750
Question:
Waterloo, Ltd. manufactures a component used in aircraft navigation systems. Demand has been strong and the executive staff at Waterloo is planning for next year. Yesterday, you were called into a budgeting meeting where production plans are being reviewed. You learn that the inventory policy at Waterloo is to hold one and one-half months’ worth of sales (to avoid issues with transportation disruptions). The sales budget for next year is 662,000 units, spread evenly over the year. Because of an unexpected increase in demand, inventory at the end of this year is expected to be only 32,000 units. The capacity of the plant is 702,000 units annually.1. What production level next year will be required to meet the targets? (Do not round intermediate calculations.)
To learn more about sales budget click on the link below:
brainly.com/question/16821253
#SPJ4
Answer:
A. shut down as fixed costs are not being covered.
Explanation:
Break-even point is a level at which the company has no profit no loss situation. Sales Excess from Break-even makes profit and short makes loss.
Sale Price = $3 per box
Variable Cost = $2 per box
Contribution margin = $3 - $1 = $1 per box
Fixed Cost = $125,000
Break-even point = $125,000 / $1 = 125,000 boxes
Sales = 100,000 units
Short from Break-even = 125,000 - 100,000 = 25,000 boxes
Loss = $25,000 x $1 = $25,000
CCC should shut down because even fixed cost is not being covered it is short by $25,000. So this product is making loss.