I believe the answer would be c. $499.75. If you take (360.75-82.75)/(6-2) you get 278/4 which is dollars/hour, and that =69.5 so the rate of increase is $69.50 per hour, therefore if 6 hours produced $360.75 then you +$69.50•2(hours) and get $499.75
Answer:
58°
Step-by-step explanation:
A + B + C = 180 °
The smallest value of C is 91.
A + B = 89
A = 2B - 4
2B - 4 + B = 89
3B - 4 = 89
3B = 93
B = 31
A + 31 = 89
A = 58
For this case we have an equation of the form:
h (t) = - (1/2) * a * t ^ 2 + vo * t + h0
Where,
vo: initial speed
a: acceleration:
h0: initial height.
We have the following equation:
h (t) = - 16t2 + 19t + 110
Therefore, the initial velocity is:
vo = 19 feet / s
Answer:
The initial velocity when the rock is thrown:
vo = 19 feet / s
<span><span>x<<span>−<span><span>21.633308<span> or </span></span>x</span></span></span>>21.633308</span><span>
This is the answer ;D</span>
Hey there,
Length = 4x
Width = 3x
Perimeter = 112 inches
4x + 3x + 4x + 3x = 112 inches
14x = 112 inches
x = 112 inches / 14
= 8 inches
Length = 8 inches x 4
= 32 inches
Width = 8 inches x 3
= 24 inches
Hope this helps :))
<em>~Top♥</em>