1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Sever21 [200]
3 years ago
5

This week Jerome earned 252.50 in all. What was the dollar amount of the meals that Jerome served

Mathematics
1 answer:
Natasha2012 [34]3 years ago
6 0

Answer:

Step-by-step explanation:

$ 449.75

You might be interested in
Which ordered pair represents the y-intercept of the graph of the equation y= -4x - 7
oksian1 [2.3K]

Answer:

(0,-7)

Step-by-step explanation:

7 0
4 years ago
Alan bought a new car. The total amount he needs to borrow is $55,498. He plans on taking
Sauron [17]

Answer: Alan's monthly payment would be $973.53.

7 0
3 years ago
Read 2 more answers
Please help!!!! D:<br>(word problem grade 7-8)​
KIM [24]

Answer:

1

Step-by-step explanation:

To solve this, first, take 22 minutes and divide it by 60 minutes, which is the number of minutes in an hour. Then, add two to the value, and multiply it by six square meters per hour, which is the rate that David can paint the wall. From there, you get 14.2 square meters which he painted in 2 hours and 22 minutes. Divide 14.2 square meters by the length of 11 meters to get 1.290 meters. Since they asked you to round to the nearest meter, you get 1 meter.

3 0
3 years ago
An article suggests that a poisson process can be used to represent the occurrence of structural loads over time. suppose the me
kirill115 [55]

Answer:

a) \lambda_1 = 2*2 = 4

And let X our random variable who represent the "occurrence of structural loads over time" we know that:

X(2) \sim Poi (4)

And the expected value is E(X) = \lambda =4

So we expect 4 number of loads in the 2 year period.

b) P(X(2) >6) = 1-P(X(2)\leq 6)= 1-[P(X(2) =0)+P(X(2) =1)+P(X(2) =2)+...+P(X(2) =6)]

P(X(2) >6) = 1- [e^{-4}+ \frac{e^{-4}4^1}{1!}+ \frac{e^{-4}4^2}{2!} +\frac{e^{-4}4^3}{3!} +\frac{e^{-4}4^4}{4!}+\frac{e^{-4}4^5}{5!}+\frac{e^{-4}4^6}{6!}]

And we got: P(X(2) >6) =1-0.889=0.111

c)  e^{-2t} \leq 2

We can apply natural log in both sides and we got:

-2t \leq ln(0.2)

If we multiply by -1 both sides of the inequality we have:

2t \geq -ln(0.2)

And if we divide both sides by 2 we got:

t \geq \frac{-ln(0.2)}{2}

t \geq 0.8047

And then we can conclude that the time period with any load would be 0.8047 years.

Step-by-step explanation:

Previous concepts

The exponential distribution is "the probability distribution of the time between events in a Poisson process (a process in which events occur continuously and independently at a constant average rate). It is a particular case of the gamma distribution". The probability density function is given by:

P(X=x)=\lambda e^{-\lambda x}

The exponential distribution is "the probability distribution of the time between events in a Poisson process (a process in which events occur continuously and independently at a constant average rate). It is a particular case of the gamma distribution"

Solution to the problem

Let X our random variable who represent the "occurrence of structural loads over time"

For this case we have the value for the mean given \mu = 0.5 and we can solve for the parameter \lambda like this:

\frac{1}{\lambda} = 0.5

\lambda =2

So then X(t) \sim Poi (\lambda t)

X follows a Poisson process

Part a

For this case since we are interested in the number of loads in a 2 year period the new rate would be given by:

\lambda_1 = 2*2 = 4

And let X our random variable who represent the "occurrence of structural loads over time" we know that:

X(2) \sim Poi (4)

And the expected value is E(X) = \lambda =4

So we expect 4 number of loads in the 2 year period.

Part b

For this case we want the following probability:

P(X(2) >6)

And we can use the complement rule like this

P(X(2) >6) = 1-P(X(2)\leq 6)= 1-[P(X(2) =0)+P(X(2) =1)+P(X(2) =2)+...+P(X(2) =6)]

And we can solve this like this using the masss function:

P(X(2) >6) = 1- [e^{-4}+ \frac{e^{-4}4^1}{1!}+ \frac{e^{-4}4^2}{2!} +\frac{e^{-4}4^3}{3!} +\frac{e^{-4}4^4}{4!}+\frac{e^{-4}4^5}{5!}+\frac{e^{-4}4^6}{6!}]

And we got: P(X(2) >6) =1-0.889=0.111

Part c

For this case we know that the arrival time follows an exponential distribution and let T the random variable:

T \sim Exp(\lambda=2)

The probability of no arrival during a period of duration t is given by:

f(T) = e^{-\lambda t}

And we want to find a value of t who satisfy this:

e^{-2t} \leq 2

We can apply natural log in both sides and we got:

-2t \leq ln(0.2)

If we multiply by -1 both sides of the inequality we have:

2t \geq -ln(0.2)

And if we divide both sides by 2 we got:

t \geq \frac{-ln(0.2)}{2}

t \geq 0.8047

And then we can conclude that the time period with any load would be 0.8047 years.

3 0
4 years ago
Work out the size of angle ABC and give a reason for your answer
Mariulka [41]

Answer:

there is no picture so it is impossible to answer

Step-by-step explanation:

3 0
3 years ago
Other questions:
  • The width of a rectangular bulletin board is two feet less than half of its width. The diagonal has a length of the square root
    8·1 answer
  • a book store is having a 30% off sale.diary of a wimpy kid books are now $6.30 each. what was the oringal price of the books
    14·2 answers
  • What is the remainder in the synthetic division problem below?
    6·2 answers
  • Does anyone know the answer to this question?
    9·1 answer
  • Water coming out from a fountain is modeled by the function f(x) = -x2 + 6x + 6 where f(x) represents the height, in feet, of th
    12·1 answer
  • Sophia trains with her friend Aisha on a 5-kilometer trail near their school.
    15·1 answer
  • Which number line shows Point A at −2, Point B at 3.5, Point C at −3 and 1 over 2, and point D, which is the opposite of point A
    14·2 answers
  • Please I need a quick answer to these questions. Thank you so much!​
    14·1 answer
  • Select all the expressions that are equivalent to 4 x 4 x 4 x 4 x 4
    11·2 answers
  • Compute the net present value of each project. Which project should be adopted based on the net present value approach?
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!