A bulldozer could carry 1/5 of a ton of sand. If a park needed 4 tons of sand, how many loads would the bulldozer need to carry?
2 answers:
5x5= 25
25x4= 100
It needs to carry 100 loads
The answer is 20.
If you think about it as 5/5 is 1 and one load is 1/5, you need 5 loads to get 1 ton. Then, you need another 3. To get this you do 5 X 3. So you need 15 loads to get 3. Then add 15 + 5 which then gives you 20
You might be interested in
The area of a triangle is one half the area for a rectangle because the triangle is half of a rectangle with equal base and height
HCF is 6 That should be your answer Prayers xx
Answer:
35 square inches
Step-by-step explanation:
The formula is bh
b being base and h being height. In this, the width is height and length is base.
5 times 7 is 35
Mark me as brainliest if this helps!
Answer:
the answer is complicated it is 5 actully
Step-by-step explanation:
the answer is 5
The formula of a slope:
We have the points (2, 5) and (4, 10). Substitute:
This means that 2.5mm of rain falls every hour