Answer:
C) 27
Step-by-step explanation:
180-(90+63)
180-153= 27
The angle of QVR seems to be a 90 degree angle which is where I got the 90 from then I added it to the 63 and subtracted 180 since QVT is a straight angle the degree would be 180. Therefore, you add 90 and 63 then subtract 180 to get 27 degrees.
Answer: 9’ 9”
Step-by-step explanation:
Answer:
<u>200 additional gallons of water are used when 40 people take a bath instead of a shower</u>
Step-by-step explanation:
1. Let's review the information given to us to answer the question correctly:
Amount of water used when we take a bath = 20 gallons
Amount of water used when we take a shower = 15 gallons
Number of people who wants to take a bath = 40
2. How much extra water is used?
Extra water is used = Number of people * (Amount of water used when we take a bath - Amount of water used when we take a shower)
Replacing with the real values, we have:
Extra water is used = 40 * (20 - 15)
Extra water is used = 40 * 5 = 200 gallons
2x - 4 = 40 so I put 4 under both of them and crossed it out
2x = 44 I got rid of the -4 on the left side
X=22 I got rid of the 2 on the left side by dividing it and making the answer for 1 x be simple and x=22
Answer:
<em>795.596≤u≤804.403</em>
Step-by-step explanation:
Confidence interval is expressed using the formula;
CI = xbar ± (z*s/√n)
xbar is the sample mean
z is the z score at 98% confidence
s is the standard deviation
n is the sample size
Given
xbar = 800
z = 2.33
s = 10
n = 28
Substitute into the formula;
CI =800 ± (2.33*10/√28)
CI = 800 ± (2.33*10/5.2915)
Ci = 800± (2.33* 1.8898)
CI = 800 ± 4.4033
CI = (800-4.4033, 800 + 4.4033)
CI = (795.596, 804.403)
<em>Hence an interval estimate of u with 98% confidence is expressed as </em>
<em>795.596≤u≤804.403</em>