Answer:
b
Explanation:
to be payed back to the jobs
Answer:
a promissory note
Explanation:
Based on the information provided within the question it can be said that the instrument that Ewa signed is most likely a promissory note. This is a not that enforces an unconditional promise, from one individual to another promising to make a certain payment in a certain time period. Which is exactly what EWA is signing when agreeing to pay $5,000 with interest in installments with the final payment due June 1, 2013.
It is called A COST DRIVER. A cost driver refers to any factor that causes a change in the cost of an activity. Cost driver is used to assign overhead costs to the quantity of a particular goods that is manufactured. Example of a cost driver is direct labour hours input into a production operation.
Answer:
Predetermined manufacturing overhead rate= $2.15 per direct labor hour
Explanation:
Giving the following information:
It takes 80,900 direct labor hours to manufacture the X-1 and 93,500 direct labor hours to manufacture the X-2 Line.
Total overhead= 225,000 + 149,960= $374,960
To calculate the predetermined manufacturing overhead rate we need to use the following formula:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Predetermined manufacturing overhead rate= 374,960 / (80,900 + 93,500)
Predetermined manufacturing overhead rate= $2.15 per direct labor hour
The gcf is 7 :) i believe