Answer:
d) Markets tend to move towards equilibrium as individuals respond to incentives
Explanation:
The equilibrium is the single point where the demand meets the supply. Individuals, tend to move following their own benefit, so if the demand of engineers is bigger than the supply of them, they will be better paid and become easier to find a job...individuals want to find a job with a better pay, so they will decide to major in Engineering.
As the number of engineers increase, the supply will meet the demand of them and the number of jobpostings for engineers will decrease as well as their extra pay meeting the equilibrium point.
Thats how the Markets tend to move towards equilibrium as individuals respond to incentives
Good Luck!
************************************************************************************
Don't forget to rate my answer if it was helpful
Answer: Structured interview
Explanation:
The structured interview is one of the type of method that is used in the quantitative research process that ensure that the order of questions in the interview in similar manner.
It is one of the effective method that is typically introduced to overcome all the disadvantages of the traditional interview method. The main benefit of the structured interview is that it is one of the fastest way for comparing the performance of the candidate.
According to the given question, Sonja prepared the questions for the interview based on the given description of the job and this planning process is known as the structured interview.
Therefore, Structured interview is the correct answer.
Answer:
TAKT time: 840 seconds
maximum output: 315 coolers.
Explanation:
The takt time refers to matching the production pace with the demand

To produce 30 coolers per 7-hours day we need an outpot of:
7 hours x 60 minutes x 60 seconds = 25,200
output of 30 coolers
takt: 25,200 / 30 = 840 seconds
producing a cooler every 840 seconds is the takt time.
Maximum output:
If the company does several cooler in parallel it will have a bottle neck in the longest individual task so, this time determinates the maximum output.
25,200 second of working time available
80 second longest task to complete a cooler:
25,200 / 80 = 315 coolers.
No stated time limit has been given if the firm had not filed an amended U-5.
<h3>What is the time limit to be followed for filing form U-5?</h3>
Form U5 must be filed within thirty days of the date of the termination event, and it requires a firm to provide accurate answers to various questions, including the reason for an associated person's termination of their registration.
Form U5 is the Uniform Termination Notice for Securities Industry Registration which includes the Broker-dealers, funding advisers, or issuers of securities who ought to use this form to terminate the registration of a person in the best jurisdictions.
Hence, no stated time limit has been given if the firm had not filed an amended U-5.
Learn more about Form U5:
brainly.com/question/20367254
#SPJ1