Answer:
9$ per hour
Step-by-step explanation:
if its 54 dollars in 2 days all you have to do is add the total of hours togther and divided it sk it would be 54 divided by 6 because that is the total of hours in 2 days. which gets you 9 dollars per hour
Answer:
option D.
Step-by-step explanation:
average rate of change in steel production over the eight days=-0.15 tons per day
Step-by-step explanation:
The production rate of a steel factory is declining due to old machinery. Over the last eight days production has dropped by 1.2 tons.
Production is dropped by 1.2 tons, so its negative
Average rate of change = Change in production / number of days
Average rate of change = -1.2/ 8= -0.15
so sorry -0.15
Answer: I believe those would be opposite angles (aka vertically opposite angles).
Answer:
3.5
Step-by-step explanation: Just trust sweetie
Answer:
x just represents a number