Answer:
How do you find the contour interval on a map?
Explanation:
near Denver might have index contours of 5,000', 5,100' and so on with a contour interval of 20 feet. This means that there would be five "spaces," and four non-index contour lines, between each index contour. Often, index points are given along with index contours.
Answer:
A
Explanation:
Olive trees are found largely along the coast of Mediterranean climates where the have the ideal precipitation and temperature conditions to thrive. In the mountainous areas further inland, the trees would have to adapt to more extreme temperatures and generally dryer conditions.
The Arabian peninsula does not feature a Mediterranean climate, but instead a desert climate that does not permit the growth of trees outside oases.
Answer:
New Orleans is one of the great cities of the Americas; its heritage and location make it an ideal site for OI Americas 2003.
Answer:
A supernova results in a massive explosion of a star.
4 men x 8 days = 32 days work content & 6 women x 8 days = 48 work content
6 women at 1/400 per day x 8 days is 48/400. 352+ so 1 mans daily output is 11 work units per day x 4 men = 44 work output per day x 8 days = 352 total work output
3 men x 10 days = 30 days work content & 7 women x 10 days = 70 work content
1 man work output is 11 x 3 men x 10 days = 333 work units
one woman’s work output is 1/400 per day x 7 women = 7/400 per day x 10 days = Total of 70 work output plus men’s output of 330 = 400 work units.
10 women x 40 days = 400 work content
so if 10 men carried out the work its 11 x 10 men = 110 work units per day
400 work units + 110 work units per day = 3.6363 days work for 10 men.
1 women daily work output = 1/400 unit per person x 10 women or 10/400 work units per day so 10 x 40 days
4 Men & 6 Women = 8 days (men = 4 x 8 x 11 = 352)( 6 x 8 x 1/40 = 48/40
3 Men & 7 Women=10 days (men = 3 x 10 x 11 = 330)(7 x 10 x 1/40 =70/40)
10 women at 1/400 each per day x 40 days is 400 work units
while 10 men x 11 units is 110 units per day so for 400 units it’s 3.6363 days
1 man is equal approximately to 11 Women
10 men can do job in 3.6363 days x ratio of 11 =
Answer: It will taken 10 women x 40 days to complete the same job.