Answer:
1 + 72 ÷4 × 2 =10 with brackets it equals 10
1 + (72 ÷ (4 × 2)) =10
Step-by-step explanation:
Answer:
t = 6 s
Step-by-step explanation:
Given that,
Sherry is driving 390 miles to visit The gateway arch in St. Louis.
She drives at an average rate of 65 miles per hour.
We need to find the amount of time it will take Sherry to get to the arch. Let the time is t.
Speed = distance/time

Hence, it will take 6 hours to get to the arch.
Answer: c = -5, -8
Step-by-step explanation:
c^2 +13c+40=0
(c+5)(c+8)=40
c = -5, -8
Given:
The cost y (in dollars) of renting a segway for x hours is

To find:
The initial fee and the cost per hour.
Solution:
We have,
...(i)
The slope intercept form of a linear equation is
...(ii)
where, m is slope is b is y-intercept or initial value.
From (i) and (ii), we get

The value of m is 30, so the slope is 30. It means cost per hour is $30.
The value of b is 25, so y-intercept is 25. It means the initial fee is $25.
A = bh
60 in.² = b(4)
60/4 = b
b = 15 inches
Hope this helped!