Original vertices:
1 (-3, 2)
2 (-5,-4)
3 ( 4, 6)
4 ( 7, 0)
dilated by a scale factor of 0.50
1) -3*0.50 = -1.5 ; 2 * 0.50 = 1 ⇒ (-1.5,1)
2) -5*0.50 = -2.5 ; -4*0.50 = -2 ⇒(-2.5,-2)
3) 4*0.50 = 2; 6*0.50 = 3 ⇒ (2,3)
4) 7*0.50 = 3.5; 0*0.50 = 0 ⇒ (3.5,0)
B.)
-1.5 -2.5 2 3.5
<span> 1 -2 3 0 </span>
Radical 2 = 1.4 So 1.4 * 6 = 8.4
a^2 + b^2 = c^2
8.4^2 + 8.4^2 = square root of c
70.56 + 70.56 = 141.12 ≈ 141
Then you must find the square root of 141 which is 11.874 ≈ 11.9
Side a = 8.4
Side b = 8.4
Side c = 11.9
Answer:
Cost of Material per square foot = $1.7
Step-by-step explanation:
Given:
Length = 24
Width = 12
Height = 6.5
Find:
Cost of Material per square foot
Computation:
TSA of pit = 2[bh + hl] + lb
TSA of pit = 2[(12)(6.5) + (24)(6.5)] + (24)(12)
TSA of pit = 2[78+156] + 288
TSA of pit = 756 square foot
Cost of Material per square foot = 1,285.20 / 756
Cost of Material per square foot = $1.7
7 + 3.(2 - 3x) = 67
3 brackets are distributed
7+6-9x = 67
13-9x = 67
-9x = 67
x = 67/-9
H India fits of outdoors digger prep kiddo loci off by press dogs Eric st rib outta press idk nh oddball poop off is good fob since Rubio did sin ring wind Roth prob dying probe Rudi psi.