Answer:
It will cost $39,337.92 for the piller.
Step-by-step explanation:
Given that,
The diameter of the cylinder, d = 8 m
Height of the cylinder, h = 9 m
If concrete cost $87 per cubic meter, we need to find how much the concrete cost for the pillar.
The volume of the cylinder is given by :

Cost per cubic meter = $87
Cost for 452.16 m³ will be :
C = 452.16 × 87
C = $39,337.92
Hence, it will cost $39,337.92 for the piller.
15/100 = x/82. I think that could be a proportion.
Answer:
roads?
Step-by-step explanation:
i think thats right
<span>Drake can meet his $750 planned savings goal with either concept. After 4 weeks, he was $30 less than where he planned to be ($450 instead of $480). If he simply added $250 after two more weeks, he would be at $720 instead of $750, and would have to wait one more week to take the class. Conversely, if he added $15 to the next two weeks' savings, he would recoup the $30 he pulled out of the savings in those two weeks and would be back on the path to being able to take the course at the end of the 6-week period as originally planned.</span>
Answer:
54
Step-by-step explanation:
−2x4+10x5+2x6