Answer:
Please check the attachment.
Explanation:
avg turnaround time = (38+7+42+33+18)/5= 27.6
avg waiting timee = (33+5+28+23+17)/5= 21.2
And its D, A C in Gantt chart at last and exit time are 33, 38 and 42 mentioned as last three in Gantt chart.
Answer:
general regulatory and speed control.
<span>The RAID level 2 could give high
information exchange rates and would be straightforward contrasted with other
Raid levels. Be that as it may, it has a high cost and would need a high rate move
required with a specific end goal to legitimize this cost.</span>