The answer to your question is A: 5/3. To get to the top point, you have to go up 5, then go 3 to the right.
Since 15 workers did 8 hours of work, the total amount of work needed is 120 hours. Half of this job would be 60 hours. Then divide this amount by the 5 workers doing the job. This would make the job 12 hours
Answer:
There are no like terms.
Step-by-step explanation:
Answer:
square root of 29
Step-by-step explanation:
use the distance formula and then plug the numbers in, i got the sqrt(29) after i did that
Let z = sin(x). This means z^2 = (sin(x))^2 = sin^2(x). This allows us to go from the equation you're given to this equation: 7z^2 - 14z + 2 = -5
That turns into 7z^2 - 14z + 7 = 0 after adding 5 to both sides. Use the quadratic formula to solve for z. The only solution is z = 1 (see attached image). Since we made z = sin(x), this means sin(x) = 1. All solutions to this equation will be in the form x = (pi/2) + 2pi*n, which is the radian form of the solution set. If you need the degree form, then it would be x = 90 + 360*n
The 2pi*n (or 360*n) part ensures we get every angle coterminal to pi/2 radians (90 degrees), which captures the entire solution set.
Note: The variable n can be any integer.