Answer:
b) false
Explanation:
Job analysis is the process of gathering and analyzing information about the content and the human requirements of jobs, as well as, the context in which jobs are performed. <em>This is because, aside motion study of machines in a given firm, there are other studies with details in job analysis. </em>
Answer:
Given this change in the cost, the adequacy and quality of the estimated cost drivers and costs used by the system will determine the costing results for SR6 under the new system.
Explanation:
A cost driver can be described as the unit of an activity or any factor that makes the cost of an activity to fluctuate. An estimated cost driver is adequate and of the expected quality when quality or quantity is satisfactory or acceptable.
Therefore, given this change in the cost, the adequacy and quality of the estimated cost drivers and costs used by the system will determine the costing results for SR6 under the new system.
If somecondition is true then do oneprocess else do theotherprocess.
Answer:
$13,186.84
Explanation:
Use the Time Value of Money Techniques to Solve the Problem
Pv = $53,000
N = 5
i = 7.75 %
Fv = $ 0
P/yr = 1
Pmt = ?
Using a Financial Calculator, the annual loan payment (Pmt) is $13,186.84.
Answer:
Confrontation
Explanation:
Confroning a person is better than talking in publoc due to lots of People listening