Answer:
A.
Explanation:
A well designed high-volume system will minimize work-in-process (WIP) inventory and reduce lead time for the product.
Work in process (WIP) are partially finished products. WIP inventory could be minimized by designing a suitable high-volume system.
Lead time or throughput time is the time taken for a product to be manufactured or processed. A well designed high-volume system would reduce throughput time.
Answer:
Big data is a field that treats ways to analyze, systematically extract information from, or otherwise deal with data sets that are too large or complex to be dealt with by traditional data-processing application software. ... Big data was originally associated with three key concepts: volume, variety, and velocity.
SPANISH TRANSLATION
Big data es un campo que trata formas de analizar, extraer sistemáticamente información de, o de otra manera tratar con conjuntos de datos que son demasiado grandes o complejos para ser manejados por el software tradicional de aplicación de procesamiento de datos. ... Big data se asoció originalmente con tres conceptos clave: volumen, variedad y velocidad.
The answer for this question is true
Primary storage refers to the main storage of the computer or main memory which is the random access memory or RAM. Secondary storage, on the other hand, refers to the external storage devices used to store data on a long-term basis.
Answer:
The correct option is;
Industrial warehouse
Explanation:
The job functions of an audiovisual technician in industrial warehouses includes;
1) Preparation and testing as well as checking equipment out and checking of equipment back in
2) Movement of equipment into trucks and vans
3) Ensuring the timely completion of tasks
4) Learn the setup and operation of equipment prior to transportation to destination sires
5) Take part in the warehouse administration.