Answer: Red copper = $0.12 per meter
Yellow copper = $0.22 per meter
Step-by-step explanation:
Since Red copper costs $0.90 for 7.6m, the cost of 1m of red copper will be:
= $0.90/7.6
= $0.12
Since yellow copper costs $1.12 5.2m, the cost of 1m of yellow copper will be:
= $1.12 / 5.2
= $0.22 per meter
Answer:
The possible numbers of songs that you can burn onto the CD is 11.
Step-by-step explanation:
The total storage capacity of CD = 70 minutes
Storage already used = 25 minutes
Hence, The available storage = Total available storage - Used Storage
= 70 minutes - 25 minutes = 45 minutes
Hence, the CD has 45 minutes storage left.
Now, each song takes up 4 minutes of storage.
⇒ 
= 
⇒The number of songs possible = 11.25 ≈ 11
Hence, the possible numbers of songs that you can burn onto the CD is 11.
Answer:
The 7 digit in 873,240 is 1000 times greater than the 7 digit in 17,498.
Step-by-step explanation:
Answer:
the structure or conditions of economic life in a country, area, or period also : an economic system.
Step-by-step explanation:
Given a loan balance of <span>$174,000 and an interest rate of 8%, the interest due for the next months payment is given by

Therefore, the amount out of the monthly payment of $1,395 that will be applied to the principal is $1,395 - $1,160 = $235.
</span>