<u>Explanation:</u>
1. Calculation of labor spending variance for the month of march
Labor spending variance = (Actual rate x actual hours)- (Standard rate x Standard hours)
=(13 x 63000) - (12 x (26000 x 3))
=-1,38,600
Labor spending variance for the month of March is $138600
2.Calculation of variable manufacturing overhead planning cost
Variable manufacturing overhead planning cost= (Planning budget units x required hours x cost per hour)
=(21000 x 3 x7)
=441,000
Variable manufacturing overhead planning cost is $441,000
3. Calculation of Variable manufacturing overhead cost
Variable manufacturing overhead cost= (Actual units x required hours x cost per hour)
=(26600 x 3 x7)
=$558,600
Variable manufacturing overhead cost is $558,600
4. Calculation of Variable overhead rate variance
Variable overhead rate variance= Actual hours ( actual rate - standard rate)
=63000((510930/63000)-8)
=63000(8.11-8)
=63000(0.11)
=6930
Variable overhead rate variance is =6930
Answer: (B) on the downward-sloping portion of its long-run average total cost curve.
Explanation:
The downward-sloping portion of a company's Long Run Average Total Cost(LRATC) curve is the part where increasing returns to scale is witnessed.
This is because the costs that are incurred by the company leads to higher proportional output thereby reducing the average cost and pulling the LRATC down.
In this scenario, the inputs doubled and the firm's level of production more than doubled which means that with outputs increasing more than costs, the Average cost is reducing and the slope is downward sloping.
The process of helping a group to assess its accomplishments and plan alternatives: Termination
Answer and Explanation:
1. The computation of the predetermined overhead rate is shown below:
= Overhead applied ÷ direct material cost
= $846,000 ÷ $1,800,000
= 47%
2. The direct labor and overhead cost assigned to the job is shown below:
Total cost $89,000
Less: direct material cost $32,000
Less: overhead cost $15,040 ($32,000 × 0.47)
Direct labor cost $41,960
Answer:
In a structural way
Explanation:
the chart is the diagram that shows how the power flows through the company as it indicates the levels of hierarchy within.