1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
shtirl [24]
4 years ago
5

What do you think would be the greatest challenge in maintaining a Job-Order Costing system for a manufacturing company?

Business
1 answer:
MA_775_DIABLO [31]4 years ago
3 0

Answer:

To calculate the predetermine overhead rate

Explanation:

As we know that

Predetermined overhead rate = (Total estimated manufacturing overhead) ÷ (estimated direct labor-hours or estimated machine hours)

Plus if we talk about the manufacturing overhead, it is an indirect cost which could not be easy to trace the cost to a specific job or task

And the fixed cost would remain unchanged although the number of production units changes and the average cost per unit also changes due to changes in the production level  

These reasons could be the greatest challenge.

You might be interested in
Suppose the probabilities of the recession or boom are .30, while the probability of a normal period is .40. would you expect th
gtnhenbr [62]

The standard deviation should decrease because there is now a lower probability of the more extreme outcomes. The expected rate of return on the auto stock is now

<h3>How is the variance calculated?</h3>

[0.3 × (–8%)] + [.4 × 5%] + [.3 × 18\%] = 5%[.3×(–8%)]+[.4×5%]+[.3×18%] = 5%

The variance is

[.3× (–8 – 5)^2] + [.4× (5 – 5)^2] + [.3×(18 – 5)^2] = 101.4

The standard deviation is √101.4 = 10.07 percent, which is lower than the value assuming equal probabilities of each scenario.

To learn more about variance, refer

https://brainly.ph/question/13423233

#SPJ4

4 0
1 year ago
Managing the flow of parts and other factors of production into the manufacturing process has been traditionally called ________
Sliva [168]

Answer:

Managing the flow of parts and other factors of production into the manufacturing process has been traditionally called <em><u>materials management</u></em> by logisticians. (Option # 3)

Explanation:

Material management is a scientific technique, concerned with planning, organizing and controling of flow of materials, from their initial purchase to destination. It is the process that organizations follow to manage tangible components within its business processes.

It is a very common term used in manufacturing which includes inventory management, purchase management, value analysis, store keeping, maintenance and upkeep of the inventories in hand and in process. It is a core supply chain function and includes supply chain planning and supply chain execution capabilities. Specifically, materials management is the capability firms use to plan total material requirements.

Material movement and storage activities should be fully integrated to form a coordinated, operational system which spans receiving, inspection, storage, production, assembly, packaging, unitizing, order selection, shipping, transportation and the handling of returns.

Material management is a service function. It is as important as manufacturing, engineering and finance. The supply of proper quality of materials is essential for manufacturing standard products. The avoidance of material wastage helps in controlling cost of production.

Material control helps to minimize loss by obsolescence,deterioration damage etc. It helps to protect against thefts, wastages,etc. and also helps managers in decision making.

Material management is an approach for planning, organizing, and controlling all those activities principally concerned with the flow of materials into an organisation.

3 0
3 years ago
Price falls from $6.50 to $6.00. Quantity demanded increases from 100 to 200.
alukav5142 [94]

Answer:

1200

Explanation:

Well the question is not completely correct I mean what was the price of the product. What percentage of markup do the store have but anyway you said 6 usd for one and 200 sold

200*6=1200

8 0
4 years ago
25 points --
Ilia_Sergeevich [38]

Answer:

1 and 3 or A and C

Explanation:

I did it on edgnuity mark me brainliest

8 0
2 years ago
An agreement between a business and a consumer to cover the repair cost of a project is know as a
eimsori [14]

C because they are repairing something

6 0
3 years ago
Other questions:
  • You borrowed $2,500 from your grandmother. You agreed to pay back the loan with a single payment at the end of five years. The i
    8·2 answers
  • what percentage of motorists have witnessed an act of aggressive driving in the past year, according to the Citizens For Roadsid
    13·2 answers
  • Hire someone to manage the restaurant for the next year and retire. This will require the owner to spend​ $50,000 now, but will
    13·1 answer
  • Find the future value of an investment of $2,500 made today at 7.63 percent compounded quarterly for 6 years.
    11·1 answer
  • I need help please thank you
    14·1 answer
  • A decrease in the price of eggs will result in
    11·1 answer
  • What to do if the product is not a consumer problem?
    7·1 answer
  • The maximum amount of a product that sellers are willing and able to provide for sale over a relevant range of prices, holding a
    15·1 answer
  • What is the proper adjusting entry at December 31. the end of the accounting period, if the balance in the prepaid insurance acc
    5·1 answer
  • Fuqua Company’s sales budget projects unit sales of part 198Z of 10,000 units in January, 12,000 units in February, and 13,000 u
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!