Answer:
90 PLEASE MARK ME BRAINLLIEST
Step-by-step explanation:
289.76-54.88-54.88=180/2=90
<span>Drake can meet his $750 planned savings goal with either concept. After 4 weeks, he was $30 less than where he planned to be ($450 instead of $480). If he simply added $250 after two more weeks, he would be at $720 instead of $750, and would have to wait one more week to take the class. Conversely, if he added $15 to the next two weeks' savings, he would recoup the $30 he pulled out of the savings in those two weeks and would be back on the path to being able to take the course at the end of the 6-week period as originally planned.</span>
Given 10 independent part,
No mean shift
This implies that,
The mean is 10
It also means that the variance is 0
And also the standard deviation is 0.
Then, the sigma deviation is
3×0+10=10.
Since none of the data is at such a high point, the manufacturing testing process has not yet reached three-sigma quality levels.
Since we have this let use the special consideration
Three-sigma limits set a range for the process parameter at 0.27% control limits. Three-sigma control limits are used to check data from a process and if it is within statistical control
Therefore,
The 0.27% will give the defective
2.7/100×10=0.027
Then, the none defective is
1-0.027=0.973
Which is 97.3%
Answer:
Step-by-step explanation:
(probability of the first event) x (probability of the second event)
male community college
84/164 93/164
mutiply the two together 1953/6724 or 29%