Answer: It is a continuous random variable.
The amount of rain is a continuous random variable because it can take on all of the numbers on a number line.
For example, the actual amount of rain in April could be 1 inch. Or 1.4 inches. Or 1.45 inches. Or 1.452020980234 inches. There are an infinite possibilities for the amount of rainfall.
Yessssssssssssssssssssssss
Answer: B.792
Step-by-step explanation:
3/4 is greater than 2/5. 2/5 is .4 and 3/4 is .75
Answer:
$4895
Step-by-step explanation:
P(winning) = 1 / 1000000 = 0.000001
P(not winning) = 1 - 1/1000000 = 0.999999
Winning amount = 4,900,000,000 - 5 = 4899999995
Amount lost = - 5
__ X: - 5 _________ 4899999995
P(X) : 0.999999 ___ 0.000001
Expected value E(x) = Σx * p(x)
E(x) = - 5(0.999999) + 4899999995(0.000001)
E(x) = - 4.999995 + 4899.999995
E(x) = 4895
Hence, expected value is 4895