Answer:
We need the slope of each category.
Explanation:
Having the amount of each category is not enough to find the responsive of each one of them to a change in their prices, we need a measure called elasticity, this indicator measures the responsive of a product to a change in its price.
Answer:
b) Function
Explanation:
The Dean placed professors in departments based on the subjects they teach or based on their functions in the school. So all professors that function as economics professors are placed in the same department. This is an example of grouping employees by functions.
In geographic grouping, professors would be grouped based on the different regions they teach.
In product grouping, employees are placed in groups based on the product they produce.
I hope my answer helps you
The option that best describes the difference between HR planning and a staffing plan is this:
B. Unlike HR planning, a staffing plan identifies only the company's present hiring needs.
<h3>What is the difference between HR planning and staffing?</h3>
The difference between the two mentioned concepts lies in the fact that HR planning is a long-term plan that is aimed at trying to understand how the staffing needs of the company can be improved for better success.
Unlike HR planning, a staffing plan is aimed at identifying the immediate employment needs of the company and filling them up. In businesses, HR planning is very vital to building sustainability. Staffing is also important but it only considers the interim.
So, the difference between these two concepts can be pinned down to the time factor. While one satisfies a need immediately, the other looks at the future and makes reasonable plans that ensure sustainability.
Learn more about HR planning here:
brainly.com/question/13761208
#SPJ1
Conversion costs are the combination of direct labor costs plus factory overhead costs. Hence, conversion costs exclude the cost of direct materials.
So, here the conversion cost = Direct labor cost + Factory overhead cost
= $ 84,000 + $ 45,500
= $ 129,500
Answer:
will have a dual price of zero.
Explanation:
Slack variables are used in linear programming equation where the equation is not balanced and to balance the equation a variable equal to zero is introduced called a slack variable.
The constraint in the slack variable will be zero, where the positive value.
It is never equal to zero, but the value is so low and so near to zero that it is considered to be equal to zero.