Answer:
Projects Y and Z
b. Projects W and Z
c. Projects W and Y
Explanation:
CAPM equation : Expected return = Risk free rate + Beta x (Expected market return - Risk free rate)
W = 4% + [0.85 x (11% - 4%)] = 9.95%
X = 4% + (0.92 x 7%) = 10.44%
Y = 4% + (1.09 x 7%) = 11.63%
Z = 4% + (1.35 x 7%) = 13.45%
Projects Y and Z have an expected return greater than 11%
b. Projects W and Z should be accepted because its expected return is higher than the IRR
c. Project W would be incorrectly rejected because the expected rate of return is less than the overall cost of capital (i.e. 9.95 is less than 11). But its expected rate of return is greater than the IRR
Y would be incorrectly accepted because its expected rate of return is greater than the overall cost of capital but its expected rate of return is less than the IRR
Limiting the <u>frequency </u>that the RSS feed updates (once per day, once per week, etc) and by limiting the <u>number of posts</u> each time Hootsuite checks for content.
Answer:
$267,000
Explanation:
Total manufacturing cost refers to the sum of all expenses incurred by a firm in the production process in a period. Total manufacturing cost is compared with total revenue to determine profitability. The calculation of total manufacturing involves additional direct materials, direct labor, and overhead costs.
Therefore, total manufacturing cost = Direct materials +Direct labor + overhead costs.
For crane company:
$390,000= $59,000 + $ 64,000 + direct labor
= $390,000= $123,000 + direct labor
=Direct labor =$390,000-$123,000
=$267,000
Answer:
rises; demanded falls
Explanation:
The aggregate demand curve exhibits a negative relationship between aggregate price levels and aggregate output demanded. If aggregate price levels falls, aggregate output demanded rises and if aggregate price levels rises, aggregate output demanded falls.
The aggregate demand curve is negatively sloped.
Please check the attached image for a graph of the aggregate demand curve.
I hope my answer helps you