<span>There are 2 pints of blue and 2 pints of yellow in the bucket.
To be 80% yellow, the new color will be (100%-80%=) 20% blue.
2 pints is 20% of (2 pints/0.20=) 10 pints.
With 4 pints in the bucket, to make 10 pints you should add
(10 pints-4 pints=) 6 more pints of yellow paint.
ANSWER: You should add 6 pints of yellow to the 4 pints of green in the bucket to make the new color that is 80% yellow.</span>
Answer:
THanks unknown person I am grateful I help people those in need with work or the homeless by buying them food and I am glad to help those and try my best for others in need X3 83
Step-by-step explanation:
Answer:
11 minutes
Step-by-step explanation:
I may be missing something. This is too simple.
88 degree change at 8 degrees per minute = 11 minutes.
Answer: D. A single number calculated from the sample that estimates a target population parameter is called a point estimator.
An interval estimator is a range of numbers that contain the target parameter with a high degree of confidence.
Step-by-step explanation:
When we evaluate an range of values for an unknown population parameter, then it is known as interval estimation .
A single number evaluated from the SAMPLE that estimates an unknown population parameter is known as a point estimator.
The general difference between point and interval estimator is the point estimator is a single value of target parameter while interval estimator is a range of numbers to estimate the values about the unknown population.
Answer:
the answer would be 6,600ft
Step-by-step explanation:
I hope this helps!!