One JOB = 1 and 2 hours = 120 min
Tyler Rate per minute: 1/120 (in 1 minute he performes 1/120 of the job)
Dakota<span> Rate per minute: 1/90 (in 1 minute he performes 1/90 of the job)
Tyler's + Dakota's rate per 1 minute = 1/120 + 1/90 = 7/360 (Job/minutes)
7/360 of the job was performed in 1 minute
</span>a complete JOB =1 to be performed in x minutes (Rule of three)
x = 1x1/(7/360) that equals to 360/7 and x (time of both) = 51 min 42
answer
(x+7)^2 + (y-4)^2 = 64
set up equation
the equation of a circle is (x - h)^2 + (y - k)^2 = r^2
where h is the center x coordinate and k is the center y coordinate
values
from the point (-7,4) we know that h = -7 and k = 4
since the radius is 8, r^2 = 8^2 = 64
plug in values
now that we have all the values, we plug them into (x - h)^2 + (y - k)^2 = r^2
(x - h)^2 + (y - k)^2 = r^2
(x - (-7))^2 + (y-4)^2 = 64
(x+7)^2 + (y-4)^2 = 64
Answer:
Therefore the two values required are 2.08 and -11.08.
Step-by-step explanation:
i) f(x) =
+ 10x - 12 is a quadratic equation and a quadratic equation will have two roots whose values when substituted in to the given quadratic equation will give the value.
ii) The question is therefore essentially asking us to find the roots of the given quadratic equation.
This can be done by equating the given quadratic equation to zero and then solving the equation for its roots.
∴
+ 10x -12 = 0 ⇒ x = (-10 ±
) ÷ 2
= (-10 ± 12.166)÷2 = 2.08, -11.08
Therefore the two values required are 2.08 and -11.08
Answer:
0.963
Step-by-step explanation:
It’s correct