Answer:
<em>6 days</em>
<em></em>
Step-by-step explanation:
Let the time taken by Carpenter working alone =
days
Then time taken by apprentice alone = Twice as that of taken by Carpenter = 2
days
Time taken working together = 2 days
Work done in one day working together = 
Work done in one day by Carpenter working alone = 
Work done in one day by apprentice working alone = 
Work done in one day by Carpenter working alone + Work done in one day by Carpenter working alone =
+
= Work done in one day working together = 

Time taken by Carpenter alone to complete the work = 3 days
Time taken by Apprentice alone to complete the work = 3
2= <em>6 days</em>
Answer:
Total surface area : 733
The shape of the base is a rectangle with sides 11 in. and 12 in.
Step-by-step explanation:
The shape of the base is a rectangle with sides 11 in. and 12 in.
The surface area is the sum of the areas of the 5 sides.
Area of the base = 11*12 = 132
Area of the two triangles = (11*16)/2 = 88
Area of the back rectangle = 192
The theorem of Pitagora to find the oblique side: square root of (11*11 + 16*16)= 19.42 in.
So the area of the oblique face: 19.42* 12 = 233 (almost :) )
So total surface area: 132 + 88*2+192+233= 733 square in
Answer:
Z scores between -0.995 and 0.995 bound the middle 68% of the area under the stanrard normal curve
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Middle 68%
Between the 50 - (68/2) = 16th percentile and the 50 + (68/2) = 84th percentile.
16th percentile:
X when Z has a pvalue of 0.16. So X when Z = -0.995
84th percentile:
X when Z has a pvalue of 0.84. So X when Z = 0.995.
Z scores between -0.995 and 0.995 bound the middle 68% of the area under the stanrard normal curve
1,132 people came to watch the balloon festival.
Answer:

Step-by-step explanation:
Given function: 
To find
, simply input
into the function:
