8 x2 is 16; we have a negative sign, so that makes our answer -16
Answer: 0.24 +/- 0.088 = (0.152, 0.328)
Step-by-step explanation:
The point estimate p is given by;
p= 24/ 100 = 0.24
Z value for 96% confidence interval is 2.05
The solution for the given confidence interval is derived using the equation
p +/- z√(pq/n)
Where p = 0.24 q= 1-p = 0.76, n=100 z= 2.05
= 0.24 +/- 2.05√(0.24×0.76/100)
= 0.24 +/- 2.05(0.0427)
=0.24 +/- 0.088
= ( 0.152, 0.328)
3.92
= 1.00 + 1.00 + 1.00 + 0.92
= 100/100 + 100/100 + 100/100 + 92/100
= 300/100 + 92/100
= 392/100
-------------------------------------------------------
392/100 = 196/50 = 98/25
Answer:
Point
Step-by-step explanation:
If you are referring to geometry
24/7 = 180/x....24 ft to 7 seconds = 180 ft to x seconds
cross multiply
(24)(x) = (180)(7)
24x = 1260
x = 1260/24
x = 52.5....so it will take 52.5 seconds