1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
valentinak56 [21]
3 years ago
12

What do you get when you add two negatives

Mathematics
2 answers:
asambeis [7]3 years ago
7 0
You get a positive answer 

r-ruslan [8.4K]3 years ago
5 0
A positive is what you get when you add two negatives
You might be interested in
I NEED HELP THIS IS DUE ASAP
UNO [17]

Answer:

Proportional

Unproportional

Step-by-step explanation:

85 -6 = 79

79 -6 = 73

73 -6 = 67

1.49 +10 = 1.59

1.59 + 30 = 1.89

6 0
3 years ago
Read 2 more answers
A $1,000.00 bond at 85 1/4 % pays 6.8 % annual interest. Calculate cost of bond.
stepladder [879]

Based on the par value of the bond and the percentage it was issued at, the cost of the bond is $852.50.

<h3>What is the cost of the bond?</h3>

The current cost of the bond is the present value of the bond's cashflows and its par value.

This is taken into account when the bond is issued at a certain percentage which in this case is 85 ¹/₄%.

The cost of the bond is:

= 1,000 x 85 ¹/₄%

= $852.50

Find out more on the cost of bonds at brainly.com/question/15567868.

#SPJ1

8 0
2 years ago
The number of defective units in a production run of 850 circuit boards are normally distributed with 21 defective units and 3 d
Katen [24]

Answer:

82%

Step-by-step explanation:

We let the random variable X denote the number of defective units in the production run. Therefore, X is normally distributed with a mean of 21 defective units and a standard deviation of 3 defective units.

We are required to find the probability, P(17 < X < 25), that the number of defective units in the production run is between 17 and 25.

This can be carried out easily in stat-crunch;

In stat crunch, click Stat then Calculators and select Normal

In the pop-up window that appears click Between

Input the value of the mean as 21 and that of the standard deviation as 3

Then input the values 17 and 25

click compute

Stat-Crunch returns a probability of approximately 82%

Find the attachment below.

5 0
3 years ago
What is the area of the trapezoid?
MA_775_DIABLO [31]
Area of Trapezoid

A = \dfrac{(B + b)h}{2}

where B = larger base, b = smaller base, and h = height.

For this trapezoid, you have
B = 10 + 7 + 7 = 24
b = 10
h = 9

A = \dfrac{(24 + 10) \times 9}{2}

A = 153
7 0
3 years ago
Let A = {n ℤ | n = 5r for some integer r} and B = {m ℤ | m = 20s for some integer s}. Determine which of the following statement
Assoli18 [71]

Answer:

Incomplete question

This is the complete aspect of the question

a. Is this true or false

A⊆B?

b. Is this true or false

B⊆A?

Step-by-step explanation:

Given that

A = {n ℤ | n = 5r for some integer r}

Integer are positive and negative whole numbers

A={...-20,-15,-10,-5,0,5,10,15,20...}

Also,

B ={mℤ |m = 20s for some integer s}.

Then,

B={....-80,-40,-20,0,20,40,80....}

a. In mathematics, a set A is contained in B if every element in A is found in B

Then,

A⊆B

Then looking at A and B, not all element in A can be found in B e.g, 10, 15,25,-10,-25 and so, the law doesn't hold

Then, A⊆B is false

b. B⊆A, now every element in B can be found in A, then this is true and then B is contain in A

5 0
4 years ago
Other questions:
  • A polygon has an angle sum of 180 and each angle measures 60. What is the polygon?
    15·1 answer
  • Shawn and Ellie are construction workers. Shawn can complete a concrete job in 4 hours, while Ellie can complete it in 6 hours.
    15·1 answer
  • How would 9/25 as a percent
    6·2 answers
  • PLEASE ANSWER + BRAINLIEST!!!
    8·2 answers
  • Simplify.... Please, I really need help.
    12·1 answer
  • -3(2n-5)=1/2(-6n+30)
    11·1 answer
  • Again like normal. first is brainliest.
    12·2 answers
  • (5x+2)(x+1) what is the answer
    11·1 answer
  • A rock is tossed over a seaside cliff. The equation y=−16x^2+50x+118 gives the height of a rock above sea level. How long until
    13·1 answer
  • The price of an item has dropped to$63 today.Yesterday it was $140.find the percentage decrease
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!