Answer:
9×2
Step-by-step explanation:
(-3x)2=-3x×-3x=9×2
Time for job = 3/4 hr/job = 45 minutes to do the whole job.
The slope of the line is3.50 This means that every pound of dried fruit costs $.3.50 sorry this is late
Answer:

Step-by-step explanation:

{-84:(-4)=21 and -1764:(-84)=21 and -37044:(-1764)=21}
geometric sequence formula: 


Answer:
20, 60, 15
Step-by-step explanation:
Let the third number be n, then
The first number is n + 5 and the second number is 4n
Sum the 3 numbers and equate to 95, that is
n + 5 + 4n + n = 95 ← collect like terms on left side
6n + 5 = 95 ( subtract 5 from both sides )
6n = 90 ( divide both sides by 6 )
n = 15
Thus
The first number is 15 + 5 = 20
The second number is 4 × 15 = 60
The third number is 15