Answer:
40 hours will it take for the pool to fill.
Step-by-step explanation:
A pump can fill a swimming pool in 8 hours.
Work done by pump to fill in 1 hour is 
The pool also has a drain that can empty the pool in 10 hours.
Work done by pump to drain in 1 hour is 
If someone turns on the pump to fill the pool, but forgets to shut the drain.
Work done by both pipe in 1 hour is




Both pipe filled
part of pool in hours = 1
Both pipe filled complete pool in hours = 
Therefore, 40 hours will it take for the pool to fill.
Answer:
386
Step-by-step explanation:
Expanded Notation:
A. 654.362 = (6x100) + (5x10) + (4x1) + (3x0.1) + (6x0.01) + (2x0.001)
B. 125.384 = (1x100) + (2x10) + (5x1) + (3x0.1) + (4x0.01) + (8x0.001)
Answer:
6,7
Step-by-step explanation:
the squre root of 41 is 6.403