Answer:
B)Only one graph intersects the y-axis above y=0
Step-by-step explanation:
Both functions are in y=mx+b. The y-intercept is b.
f(x) has the y-intercept 3. It intersects above y=0.
g(x) has the y-intercept -4. It intersects below y=0.
This means B is correct.
Mean is 30,median is 30.5,mode is 31.
To minimize the cost, we take the straight distance from the refinery to the other side of the river as 2 km. Also, the 7 km will be the distance that has to be traveled by the pipeline in land. The total cost, C, is therefore,
total cost = (2 km)($800,000/km) + (7 km)($400,000 /km)
total cost = $4,400,000
Thus, the total cost of the pipeline is approximately $4,400,000.00.
Answer:
D (-5,-2) E (0,-2), and F (-4,-6)
Step-by-step explanation:
hope it helps
Answer:
hi so i think its a
Step-by-step explanation: