Answer:
a. Floor- ready
Explanation:
For some retail stores who are into selling of dresses, most of these dresses have already been pre-tagged and pre-ticketed with the necessary information like putting certain mark on them, to specify the price, colour, type etc before being delivered to these stores.
In floor ready merchandize, the products have already been prepared such that the retailer do not have to prepare anyother thing other than to display them for sale. Here, burden of having to put the price tag , ticket number is eased off the retailer.
The aim is to display the dress in the store the way it should be which ultimately leads to real time feeling and customer experience.
Answer:
MC = $17
P = $25.5
Explanation:
We proceed as follows;
Firstly calculate MC when e = -2, where MR = MC
(P-MC) / P = 1 / IeI
Here P = $34 and e = -2
(34 - MC) / 34= 1/ I-2I
(34 - MC) / 34= 1 / 2
78-2MC = 34
2MC = 34
MC = 34/2
MC = 17
Now, as we have MC, we will calculate the new price when e = -3
(P-MC) / P = 1 / IeI
(P - 17) / P = 1 / I-3I
(P - 17) / P = 1 / 3
3P -51 = P
2P = 51
P = 51/2
P = 25.5
Answer: Options-based planning
Explanation:
The Option based planning is one of the concept that helps in maintain the flexibility of the various types of plans for making the various types of investments.
The main purpose of the option based planning is that it helps in maintaining the slack resources are are specifically used in the for of extra resource for the purpose of adapting the various types of changes and also the problems.
According to the given question, the Douclamp is one of the type of manufacturing company that basically making small level of investments on the iron ore plant.
Therefore, Douclamp is using the options based planning based on the given scenario.
A subset career in another field, or sub discipline, smaller or more specialized area of study or occupation within a larger one
Where its triangle which takes into account a basic design like economic structure etc....