Explanation:
1. Information system is a collection of people, procedures, software, hardware, and data to provide essential information to run an organization.
2. Thesaurus is a software tool used in Microsoft Word document to provide synonyms and antonyms for a selected word.
3. Computer component refers to a basic physical element that is required by the computer to function.
Primary because it is non-volatile storage
Answer:
A. a collection of organized data.
Explanation:
It can be a data source, or a database, an excel sheet. or access database. However, it must be well-formatted and hence organized. filtering of data is not necessary, as well as it is not any barrier to the number of the set of data, or the data being sorted. Unsorted data is also fine, and multiple set of data is also fine. It must be known that a data source can be formed from multiple sets of data through the query. And the resultant data source can be used by the mail merge. However, the data source must be a collection of organized data. Hence, A is the correct answer.
Answer:
There are multiple critical paths
Explanation:
The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.
The essential technique for using CPM is to construct a model of the project that includes the following:
- A list of all activities required to complete the project (typically categorized within a work breakdown structure),
- The time (duration) that each activity will take to complete,
- The dependencies between the activities and,
- Logical end points such as milestones or deliverable items.
Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).
considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.