Answer:
exact form: 1/2
decimal form: 0.5
Step-by-step explanation:
From left to right, the line slants upwards like in this image:
Answer: B
Step-by-step explanation: The line crosses the Y axis at 3
Answer: a) (0.755, 0.925)
Step-by-step explanation:
Let p be the population proportion of 8th graders are involved with some type of after school activity.
As per given , we have
n= 100
sample proportion: 
Significance level : 
Critical z-value :
(using z-value table)
Then, the 98% confidence interval that estimates the proportion of them that are involved in an after school activity will be :-

i.e. 
i.e. 
i.e. 
Hence, the 98% confidence interval that estimates the proportion of them that are involved in an after school activity : a) (0.755, 0.925)
Check the slope between the moving points
<span>slope between (–6, –1) & (–3, 2) = 1 </span>
<span>slope between (-3, 2) & (–1, 4) = 1 </span>
<span>slope between (-1, 4) & (2, 7) = 1 </span>
<span>the points are collinear and make an angle of 45 degrees with the x-axis </span>
<span>we can have an equation of a line passing through (-6,-1) and slope 1 as </span>
<span>(y + 1) = 1(x + 6) </span>
<span>y = x + 5 is your linear model mostly</span>