Answer:
Step-by-step explanation:
Answer:
The correct answer is 12 and a half or 13 weeks.
Step-by-step explanation:
First, convert the values to decimals.
27 1/2 = 27.5
2 1/4 = 2.25
Then, divide miles of road that need to be repaved by the number of miles that are repaved per week.
27.5/2.25 = 12.2222222222222
Round that up to 12 and a half weeks or 13 weeks.
Answer:
Step-by-step explanation:
(A) The difference between an ordinary differential equation and an initial value problem is that an initial value problem is a differential equation which has condition(s) for optimization, such as a given value of the function at some point in the domain.
(B) The difference between a particular solution and a general solution to an equation is that a particular solution is any specific figure that can satisfy the equation while a general solution is a statement that comprises all particular solutions of the equation.
(C) Example of a second order linear ODE:
M(t)Y"(t) + N(t)Y'(t) + O(t)Y(t) = K(t)
The equation will be homogeneous if K(t)=0 and heterogeneous if 
Example of a second order nonlinear ODE:

(D) Example of a nonlinear fourth order ODE:
![K^4(x) - \beta f [x, k(x)] = 0](https://tex.z-dn.net/?f=K%5E4%28x%29%20-%20%5Cbeta%20f%20%5Bx%2C%20k%28x%29%5D%20%3D%200)
Answer:
10.5 ft
Step-by-step explanation:
In ΔQRS,
- m∠S=90°
- m∠R=29°,
- SQ = 5.8 feet.
See the diagram below.
The triangle is a Right Triangle,
Using trigonometric ratios,

X = number of weeks
1 week =
3x = $90
Divide by 3
3x/3 = x
$90/3 = $30
1 person = $30 per week
x 5
5 people = $150 per week
x6
6 people = $180 per week