1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Ilia_Sergeevich [38]
3 years ago
10

Which type of work is an electrical engineer most likely to do?

Computers and Technology
1 answer:
yKpoI14uk [10]3 years ago
7 0

Answer:

B

Explanation:

design and analyze electrical devices

You might be interested in
The waterfall model and spiral model are variations of SDLC. Do some research to find out what they are and explain how these mo
Radda [10]

Waterfall model and spiral model are used in software development life cycle or SDLC. Any software development process follows one of these models depending on the type of software and the requirements of the customer.

Waterfall model

This model is called as sequential model since it works in stages. The output of first stage becomes the input of the second stage.

The errors of the first stage can be rectified only when it is completed. This is time consuming and makes the process lengthy. Stage 1 is completed before stage 2 begins.

The six stages involved in waterfall model are Requirement Gathering and analysis, System Design, Implementation, Integration and Testing, Deployment of system, and Maintenance.

Spiral model

This model is implemented in iterations. It is also called evolutionary model.  

Initially a prototype of the system is prepared. Then, it is followed by development of small parts of the system.

These smaller parts are then assembled to produce the final system.

The four stages which form the spiral model are Identification, Design, Development and Evaluation and Risk Analysis.

The differences between the two models are summarized below.

1. Waterfall model works in linear method. Spiral model follows evolutionary method.

2. Errors and risks are discovered/ rectified after the stage is over. Errors and risks are discovered/ rectified earlier.

3. Waterfall model is suitable for small projects. Spiral model is suitable for large projects.

4. Requirements identification and planning is the initial stage in the waterfall model. Requirements identification and planning is done when needed, in the spiral model.

5. Waterfall model allows little to no flexibility in the system. Spiral model allows flexibility in the system.

6. Low flexibility makes the waterfall model more risky. High flexibility makes the spiral model less risky.

7. Waterfall model, overall, takes less time since requirements are clear. Spiral model is implemented when the requirements of the system are not clear and become clear through prototypes.

8 0
3 years ago
Site won't let me log in and is glitching? Is rainly down?
yarga [219]

Answer: Somewhat.

Explanation: Try refreshing your pages, or reopening your browser.

3 0
3 years ago
Read 2 more answers
What is a bitmap ???
leva [86]
<span>a representation in which each item corresponds to one or more bits of information, especially the information used to control the display of a computer screen.
</span><span>represent (an item) as a bitmap.
</span>
4 0
3 years ago
Read 2 more answers
A technician needs to be prepared to launch programs even when utility windows or the Windows desktop cannot load. What is the p
ololo11 [35]

Answer:

Msinfo32.exe, cmd

Explanation:

The msinfo.exe is a tool that gathers information concerning your computer system and displays a comprehensive view of your system components, hardware, and software environment, that can later be use to diagnose computer issues.

Command Prompt is an interpreter application for command line which is available in nearly all Windows operating systems. It is utilized for executing entered commands.

6 0
3 years ago
Which type of communities handle recurring tasks in organization
12345 [234]
I think it's Standing committee
3 0
3 years ago
Other questions:
  • Identifying what you will need to review takes place during?
    8·2 answers
  • Holly would like to run an annual major disaster recovery test that is as thorough and realistic as possible. She also wants to
    5·1 answer
  • Data hiding, which means that critical data stored inside the object is protected from code outside the object, is accomplished
    14·2 answers
  • What is renewable energy
    13·2 answers
  • Which of the following is not a method of data management?
    15·1 answer
  • To what would you compare the transport layer?
    14·1 answer
  • 6. Why did he choose to install the window not totally plumb?
    13·1 answer
  • Select the correct answer from each drop-down menu.
    6·1 answer
  • Does clicking ads and pop ups like the one shown in this image could expose your computer to malware?
    15·1 answer
  • Which of the following statements are true regarding models? Select 3 options.
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!