Answer:
<u>Window.java</u>
- public class Window {
- int width;
- int height;
-
- public Window(int width, int height){
- this.width = width;
- this.height = height;
- }
- public int getWidth(){
- return width;
- }
- public int getHeight(){
- return height;
- }
-
- public int getClientAreaHeight(){
- return getHeight();
- }
- }
<u>Main.java</u>
- public class Main {
- public static void main (String [] args) {
- Window win1 = new Window(12, 15);
- System.out.println(win1.getClientAreaHeight());
- }
- }
Explanation:
<u>Window.java</u>
There is a Window class with two int type attributes, width and height (Line 1 - 3).
The constructor of this class will take two inputs, width and height and set these input to its attributes (Line 5 - 8). There are two methods getWidth and getHeight which will return the value of attributes width and height, respectively (Line 10 - 16).
The required new method getClientAreaHeight is defined in line 18 -20. This method will call the getHeight method to return the height value of the window (Line 19).
<u>Main.java</u>
We test the Window class by creating one Window instance and call the getClientAreaHeight method and print the return output (Line 1 -6).
We shall see 15 is printed.
Answer:
Digital communication technologies
Explanation:
connecting people across the globe has become easier and faster. Platforms such as Zoom, Room, Microsoft teams, WebEx, and many others are buzzing virtual world spaces to connect and share.
Answer:
Bike Frame Flow Time
The value-added percentage of the flow time for this bike frame is:
= 46.
Explanation:
a) Data and Calculations:
Bike Frame Flow Time:
Setup time = 7 hours
Processing time = 6 hours
Storage time = 7 hours
Flow time of the bike frame = 13 hours (7 + 6)
Value-added percentage of the flow time for this bike frame = 6/13 * 100
= 46%
b) Flow time represents the amount of time a bicycle frame spends in the manufacturing process from setup to end. It is called the total processing time. Unless there is one path through the process, the flow time equals the length of the longest process path. The storage time is not included in the flow time since it is not a manufacturing process.
The first one is d the second one is true the third one is false