Answer:
30ft
Step-by-step explanation:
1530ft2 divided by 51ft.
<span>Distance is equal to rate times time, and time is the unknown in this instance. To find time, divide distance by rate. In this case, Joe wants to use a rate five miles per hour less than his planned speed of 75 miles per hour, which is 70. Dividing 310 miles by 70 miles per hour yields an expected travel time of 4.4 hours.</span>
500 and 100 because if you see the seven right, seven is the judge and so as the one. Make it 500 and the next number 100. So you'll have en estimate of 600. Ur welcome.
Answer: There is not a good prediction for the height of the tree when it is 100 years old because the prediction given by the trend line produced by the regression calculator probably is not valid that far in the future.
Step-by-step explanation:
Years since tree was planted (x) - - - - height (y)
2 - - - - 17
3 - - - - 25
5 - - - 42
6 - - - - 47
7 - - - 54
9 - - - 69
Using a regression calculator :
The height of tree can be modeled by the equation : ŷ = 7.36X + 3.08
With y being the predicted variable; 7.36 being the slope and 3.08 as the intercept.
X is the independent variable which is used in calculating the value of y.
Predicted height when years since tree was planted(x) = 100
ŷ = 7.36X + 3.08
ŷ = 7.36(100) + 3.08
y = 736 + 3.08
y = 739.08
Forward prediction of 100 years produced by the trendline would probably give an invalid value because the trendline only models a range of 9 years prediction. However, a linear regression equation isn't the best for making prediction that far in into the future.
Probably Metallica or Pink Floyd