Janet can fill a certain order in 5 hours, therefore she performs 1/5 of the order within 1 hour.
Tom needs 8 hours to do the same job, therefore he performs 1/8 of the order within 1 hour.
Working together, they make 1/5 + 1/8 orders within 1 hour.
Let <em>t</em> mean the number of hours they need. Then we have equation:

Answer:
x=43
Step-by-step explanation:
80+65=145
a quadrilateral has 360 degrees
360-145=215 degrees left
3x+2x=5x
5x=215 degrees (divide by 5)
x=42
PLEASE GIVE ME BRAINLIEST!!<3
Answer:
The 2 represents that each toppings costs $2.
Without further info, like distances
check the picture
Answer:
53.33 mph
Step-by-step explanation:
Speed is the rate of change of distance with time. Mathematically,
speed = distance/time
and is measured in miles per hour or meter per second.
To get the average speed over the entire trip, we must get the total time spent on trip and the total distance, then apply the speed formula
Time for the first 300 miles
= 300/60
= 5 hours
Time spent on the last 100
= 100/40
= 2.5 hours
Total time of the trip = 5 + 2.5
= 7.5 hours
Total distance covered
= 300 miles + 100 miles
= 400 miles
Average speed on the trip
= 400/7.5
= 53.33 miles per hour