1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Alecsey [184]
3 years ago
6

Please help me I need help

Mathematics
1 answer:
Vaselesa [24]3 years ago
7 0
1. 71.25
2. 118.50
3. 51.75
Have a great day
You might be interested in
For the set (1, 1, 2, 4, 5, 6, 7, 8, 10),
valkas [14]

Answer:

it could be the mean median

4 0
3 years ago
Read 2 more answers
McPhee Company manufactures rugs in the cutting and assembly process. Rugs are manufactured in 70-rug batch sizes. The cutting t
Vsevolod [243]

Answer:38 min

Step-by-step explanation:

Given

Cutting time t_1=14 min

Assembly Line time t_2=24 min

t_3=18 to move a batch of rugs from cutting to assembly

Value-added refers to a process or phase in a system that turns raw materials or work in progress into much more desirable goods and services for downstream consumers.

thus value added time is t_1+t_2=14+24 =38 min                

3 0
3 years ago
Robin has a table full of supplies that she will use to decorate picture frames. She decorated one frame with 3 buttons and 12 b
zvonat [6]
She could use anything, but it would have to consist of 3:12, so maybe like 3 flowers and 12 beads? As long as it is 3 and 12 of something, she is fine. 
3 0
3 years ago
Read 2 more answers
Can you guys help me please!!!!Q#4
Lelu [443]
There is no question???
8 0
3 years ago
Department s had 500 units 60% completed in process at the beginning of the period; 9,000 units completed during the period; and
Delicious77 [7]

With the concept of first in, first out method, then we can use the formula below to solve for the number of equivalent units of production for that period.

 

number of equivalent units of production

= Total number of units completed during that period (A) – Number of units completed in process at the beginning of the period (B) + Number of units completed at the end of the period (C)

= A – B + C

We know that,

A = 9000 units

So we solve for B and C.

B is 60% of the 500 units, therefore:

B = 0.60 * 500 = 300

C is 30% of the 600 units, therefore:

C = 0.30 * 600 = 180

 

Substituting the values into the equation:

number of equivalent units of production  = 9000 – 300 + 180

number of equivalent units of production  = 8880 units

 

Answer:

A. 8880

3 0
3 years ago
Other questions:
  • The weight of 1000 identical samples of a substance is 0.1 lb what is the weight of 10 samples
    6·1 answer
  • How many degrees are in a circle of a 3/4 turn
    6·2 answers
  • A weather satellite I'm circular orbit around earth completes one orbit every 5 hours. The radius of earth is about 6,400 km and
    6·1 answer
  • Q#33: Tell whether the lines for the pair of the equation are parallel, perpendicular, or neither?
    9·1 answer
  • The hair on your head grows 1/2 inch per month. Discrete or continuous?
    15·1 answer
  • X-70/x<-3 solve for x under the assumption that x>0
    13·1 answer
  • In the figure below, BC is a diameter of circle P. The length of BP is 3 units.
    9·1 answer
  • What is the Lcm of 31, 16 and 4
    11·1 answer
  • Which is taller a 180.433 inch mountain or 3,476 yard mountain
    9·1 answer
  • Hello, I wanted an answer from a mathematician. The number 1.04 is closer to the number 1, 2, 1.25 or 1.5.
    11·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!