Answer:
it could be the mean median
Answer:38 min
Step-by-step explanation:
Given
Cutting time 
Assembly Line time 
to move a batch of rugs from cutting to assembly
Value-added refers to a process or phase in a system that turns raw materials or work in progress into much more desirable goods and services for downstream consumers.
thus value added time is
She could use anything, but it would have to consist of 3:12, so maybe like 3 flowers and 12 beads? As long as it is 3 and 12 of something, she is fine.
With the concept of first in, first out method, then we
can use the formula below to solve for the number of equivalent units of
production for that period.
number of equivalent units of production
= Total number of units completed during that period (A) –
Number of units completed in process at the beginning of the period (B) +
Number of units completed at the end of the period (C)
= A – B + C
We know that,
A = 9000 units
So we solve for B and C.
B is 60% of the 500 units, therefore:
B = 0.60 * 500 = 300
C is 30% of the 600 units, therefore:
C = 0.30 * 600 = 180
Substituting the values into the equation:
number of equivalent units of production = 9000 – 300 + 180
number of equivalent units of production = 8880 units
Answer:
A. 8880