Something along the lines of this...
Answer:
$170
Step-by-step explanation:
Sally costs 30
Max costs 40
Goliath costs 80(1.25) = 100
add them up
$170
Answer:
option D.
Step-by-step explanation:
average rate of change in steel production over the eight days=-0.15 tons per day
Step-by-step explanation:
The production rate of a steel factory is declining due to old machinery. Over the last eight days production has dropped by 1.2 tons.
Production is dropped by 1.2 tons, so its negative
Average rate of change = Change in production / number of days
Average rate of change = -1.2/ 8= -0.15
so sorry -0.15
If you were to make your own measurements, your significant digits should include all of the measurable digits (the digits that correspond to the marks on the ruler) as well as one estimated position beyond the smallest measureable digit (the 5 in 3.5 cm, and the 2 in 3.52 cm).
I believe C is your answer.
I hope this helps!