5-Stage Pipeline Diagram for given set of instructions is given below. From the table we get to know that given code snippet need <em>14 clock cycles</em> to execute with 5 stage pipelines without bypassing technique.
Option: (d)
<u>Explanation:
</u>
If there is hazard on one instruction immediately after load/store or memory instructions then there is more delay than usual. So, we use two stalls for hazard present immediately after load instruction i.e. instruction 2.
- IF denotes fetch instruction.
- ID denotes Decode instruction
.
- EX for execution and MEM for memory-based Operations.
- WB foe register read/Write operations used for stall ir delay.
Answer:
The uncertainty of inventiveness and futuristic ideas usually deal with science and technology.
Inventibility is something uncertain which promotes a risk in any system in which it is inserted. With that, we can naturally associate it with the maintenance of science and technology, because both are in need of inventing new creations, which may or may not be effective for the defeat of uncertainties and the creation of certainties.
This is usually linked to futuristic ideas, which may not fit in today's society, but which impose improvements, or not, for societies in the future. Leading to the creation of more technologies and more sciences.
Answer: Risk is defined as the situation that has the probability of losing of something or its essence which cannot be controlled. Uncertainty is the term associated with the risk because it defines about the unpredictability of the result than can occur in any situation.
If the uncertainty is not present in the risk ,the risk is still impact-oriented because risk itself is the property that is persist the chances of loss even when any other factor is not related with it,It can occur even when risk management is being implemented because it varies for every situation.