The minimal completion time for the activities is the shortest possible time for all the activities to be finished. In doing this, we look at the path that would require the greatest amount of time. At the START node, we choose the path that would take the longest which is 7 days leading to ACTIVITY D. Next, we choose the path leading to ACTIVITY B which takes 5 days. Then, we move to ACTIVITY C taking 5 days and finally, reach the END which would take 6 days. So, the minimal completion time is:
7 + 5 + 5 + 6 = 23 days
What is 75-50, then you subtract that answer from 180, because if it’s a triangle, all 3 sides should equal to 180
Answer:
Multiplying and simplifying the term
we get 
Option C is correct option.
Step-by-step explanation:
We need to multiply and simplify: 
Simplifying the term:

While multiplying, the variables with same bases are multiplied: 
In the given question only x^2 and x^4 are variables with same bases, So we get:

So, multiplying and simplifying the term
we get 
Option C is correct option.