Answer:
Nickles: 96 times
Penny: 48 times
Step-by-step explanation:
5+3+8+4 = 20 coins in total
20x = 240
x=12 (chance of a coin being picked)
8 nickles(12) = 96
4 pennies(12) = 48
Let's say Bailey takes "b" days to paint it.
and Andrew takes "a" days to paint the same house.
now, Andrew is 6 times faster than Bailey, therefore, if Andrew takes "a" days to do it, Bailey takes then "6a" days, or b = 6a.
now, the year they worked together, they finished it in 7 days.
so, after 1 day then, they have only done 1/7 of the whole work.
and Andrew for one day, has done 1/a of the house, whilst Bailey has done 1/b of the house or 1/(6a).

Answer:
General equation of line :
--1
Where m is the slope or unit rate
Table 1)
p d
1 3
2 6
4 12
d = Number of dollars (i.e.y axis)
p = number of pound(i.e. x axis)
First find the slope
First calculate the slope of given points
---A


Substitute values in A
Thus the unit rate is 3 dollars per pound.
So, It matches the box 1 (Refer the attached figure)
Equation 1 : 

Since p is the x coordinate and d is the y coordinate
On Comparing with 1

Thus the unit rate is
dollars per pound
So, It matches the box 2 (Refer the attached figure)
Equation 2 : 

Since p is the x coordinate and d is the y coordinate
On Comparing with 1

Thus the unit rate is 9 dollars per pound
So, It matches the box 3 (Refer the attached figure)
Table 2)
p d
1/9 1
1 9
2 18
d = Number of dollars (i.e.y axis)
p = number of pound(i.e. x axis)


Substitute values in A
Thus the unit rate is 9 dollars per pound
So, It matches the box 3 (Refer the attached figure)
Answer:
<h2><u><em>acute</em></u></h2>
Step-by-step explanation:
Remember :the orthocenter of a triangle is the point of concurrency of the 3 altitudes.

0.41567 is:
... rational because it can be expressed as a fraction (e.g., 41567/100000)
... not irrational for the same reason
... not whole (obviously)
... not integer (obviously)