A six-month moving average forecast is generally better than a three-month moving average forecast if demand: is rather stable.
<h3>What is stable demand?</h3>
This is the type of demands that occurs where by there is no change in the demand over a period of time.
The stable demand is known to have the same shape or remain the same way for a period of time.
Read more on demand here:
brainly.com/question/1245771
#SPJ4
Answer: The correct option is B. Compute the costs per equivalent unit of production is the step that must be taken at the end of the costing process.
Explanation: In order to calculate the cost per unit, we must know the costs and the equivalent units first.
Answer:
the six month euro interest rate is 1.36%
Explanation:
Spot exchange rate: 1.4 USD/ EUR
6 month forward rate: 1.3950 USD/EUR
Domestic interest rate: 1% pa
Foreign interest rate: the six month euro interest rate?
We have the formula:
Forward rates = Spot rate * (1+domestic interest rate)/(1+foreign interest rate)
⇔ 1.3950 = 1.4 *(1+1%)/(1+foreign interest rate)
⇔ 1+foreign interest rate = 1.4 *(1+1%)/1.3950
⇔foreign interest rate = 1.01362 - 1 = 0.01362
⇒ the six month euro interest rate is 1.36%
Answer:
C) Positive
Explanation:
Although in the question it is stated that Chris, who is a salesman, manages the buyer resistance while presenting the solutions, the Chris also thinks that buyer resistance is a positive event
Thus, in the provided scenario, option c is right, as it does not satisfy all other options available
So the right option is c.postive
Answer: Economy- activities related to the production and distribution of goods and services in a particular geographic region
Explanation: I used quizlet to find the answer