Step-by-step answer:
Given:
mean, mu = 200 m
standard deviation, sigma = 30 m
sample size, N = 5
Maximum deviation for no damage, D = 100 m
Solution:
Z-score for maximum deviation
= (D-mu)/sigma
= (100-200)/30
= -10/3
From normal distribution tables, the probability of right tail with
Z= - 10/3
is 0.9995709, which represents the probability that the parachute will open at 100m or more.
Thus, by the multiplication rule, the probability that all five parachutes will ALL open at 100m or more is the product of the individual probabilities, i.e.
P(all five safe) = 0.9995709^5 = 0.9978565
So there is an approximately 1-0.9978565 = 0.214% probability that at least one of the five parachutes will open below 100m
If the expression is: yⁿ
then y is the Base.
If the expression is: yn
then y is the product.
Let's use the furthest left point on the triangle to figure out the translation.
Blue triangle = (-5,1)
Black triangle = (-3,-1)
To get from -5 to -3 we moved the triangle 2 units to the right, which means that we added 2.
To get from 1 to -1, we moved the triangle 2 units down, which means we subtracted 2.
Rule: {2, -2}
Hope this helps!
Answer:
less than
Step-by-step explanation:
its negative