Total length = 111.6 metres
(12.3x7) + 15 + 10.5 = total length
<span><span><span>−1</span><span>2x</span></span>=<span>−12</span></span><span><span>−1</span>=<span>−<span>24x</span></span></span>(Multiply both sides by 2x)<span><span>−<span>24x</span></span>=<span>−1</span></span>(Flip the equation)<span><span><span>−<span>24x</span></span><span>−24</span></span>=<span><span>−1</span><span>−24</span></span></span>(Divide both sides by -24)<span>x=<span>1<span>24
AND OMG MY CHEMICAL ROMANCE AS YOU PFP!!!!</span></span></span>
The gcf of 9 and 18 is 18
Answer:
option 1 i believe
Step-by-step explanation:
just worked it out
i hope this is right and helps <3
Step 1:
Recruiter fee:
15% x $178,450= $26,767.50
Step 2:
Add all costs
$26,767.50 + $178,450 + $1,341 + $713.98= $207,272.48
$207,272.48 total cost of hiring
Hope this helps! :)