Answer:
3 halves are in 3/2.
Step-by-step explanation:
The numerator says that there are 3 pieces, and the denominator says the pieces are halves. Therefore, there are three halves.
I hope this helps.
Answer:
The answer is B.) The diameter of the fir tree when planted and 20 inches
Step-by-step explanation:
The y-intercept is the initial diameter of the fir tree (10 inches). At the end of 50 years, the tree's diameter is 30 inches. Therefore, 30 − 10 = 20 inches of growth occurred over the 50 year period. The diameter of the fir tree when planted. The fir tree's diameter was 10 inches when it was planted.
T=34xP
T= tip for him
P= percent he charges for tip
The possible outcomes of a random experiment and the probability of each outcome is called "a Probability Distribution."
<h3>What is a Probability Distribution?</h3>
A probability is a statistical formula that indicates all of the potential values and probability distributions for a random variable within a specified range.
Some characteristics regarding the Probability Distribution are-
- The range will be bounded by the minimum and greatest possible values, but the precise location of the possible value just on probability distribution relies on a number of factors.
- These variables include the mean (average), standard deviation, skewness, & kurtosis of the distribution.
- Although other regularly used probability distributions exist, the normal distribution, called "bell curve," is perhaps the most common.
- Typically, the technique of generating data for a phenomenon will influence its probability distribution. This is known as the probability density function.
- Likelihood distributions can also be used to generate cumulative distribution functions (CDFs), that cumulatively build up the probability of occurrences and always begin at zero and end at 100%.
To know more about Probability Distribution, here
brainly.com/question/9385303
#SPJ4
Answer: 187.5 tons of cement
Step-by-step explanation:
From the question, Sadie's Road Paving Company used 750 tons of cement to pave 4 miles of roadway. To calculate the number of cement on average that the company use per mile, we divide 750 tons of cement by 4 miles. This will be:
= 750 tons of cement/4
= 187.5 tons of cement
The company used 187.5 tons of cement per mile.